lusternational

Project Scheduler

Apply Now

At a Glance

Location
Los Angeles, California, United States
Experience
5+ years
Compensation
ted Salary: $120k-$190k/year ($57-$91/hour). Luster provides the sa
Posted
2026-03-02T23:48:12-05:00

Key Requirements

Required Skills

ExcelMicrosoft OfficePower BIPowerPointTableau

Certifications

  • PMP

Domain Knowledge

  • Construction
  • Education
  • Engineering

Benefits & Perks

Health Insurance

Health, dental, and vision insurance Flexible spending accounts (healthcare

Requirements

, complex, heavy-civil infrastructure projects.

Experience delivering projects through both traditional and alternative methods (e.g., DB, CM/GC, P3, CMAR).

Proficiency with Power BI, Tableau, or similar platforms for building interactive dashboards and KPI visualizations.

Compensation & Benefits

Expected

Salary: $120k-$190k/year ($57-$91/hour). Luster

provides

mpany in

good faith believes it might offer for this position based on the successful candidate’s level of experience, knowledge, skills, abilities, education, certifications, licenses, geographic location, etc. Luster reserves the right to

Responsibilities

at various levels for large, heavy-civil infrastructure programs, including highways, roads, bridges, transit (both rail and bus), water, and airport projects delivered through both traditional and alternative methods.

You’ll craft logic-driven CPM schedules, fold in procurement and third-party dependencies, and convert field data into clear progress updates and forecasts.

Build and maintain an integrated CPM schedule that could cover design through turnover, with logically linked activities, resource or cost loading, and clear coding for cost-control alignment.

Collect field progress data, update status weekly or monthly, and produce look-aheads, variance reports, and earned-value forecasts.

Run critical path and what-if analyses to test sequencing options, recovery plans, and alternative delivery scenarios.

Integrate third-party interfaces, permitting, utility relocations, and long-lead procurement items, so the plan reflects all external dependencies.