ontariotransitgroup

CAD Operator (Draftsperson)

Apply Now

At a Glance

Location
Toronto, Ontario, Canada
Employment
Full-time
Posted
2026-07-27T14:51:26.045Z

Key Requirements

Required Skills

AutoCAD

Certifications

  • SAFe

Domain Knowledge

  • Engineering

Benefits & Perks

Health Insurance

Insurance Extended medical insurance (Optional) RRSP matching Discretionary

Requirements

Relevant design experience in structural or civil engineering, ideally on infrastructure, tunneling, or heavy civil projects.

Compensation & Benefits

What We Offer

Competitive Salary

Comprehensive Benefits Package:

Disability Insurance

Dental Insurance

Extended medical insurance

Responsibilities

This role produces high-quality drawings that illustrate sequences, define the temporary works, and the interfaces between civil works, SEM excavation, TBM tunneling, and subsequent MEP and architectural installations.

The Draftsman helps ensure constructability, alignment of multiple disciplines through accurate, coordinated drawings and safe planning, by engineering and construction teams.

Produce clear, technically accurate 2D/3D drawings.

Prepare the site installations drawings and keep them updated as per the site progress and needs related to new activities.

Prepare interface drawings that illustrate the coordination requirements between Civil, SEM and TBM works, and then MEP and architectural installations.

Prepare multi-discipline coordination drawings, ensuring alignment of geometry, access requirements, and construction sequence constraints.

About the Company

Ferrovial Construction Canada Inc. and VINCI Construction Grands Projets are undertaking the design, build, and finance the Ontario Line Southern Civil, Stations, and Tunnel (South Civil) package.

As Ontario Transit Group, we are now mobilizing our design and construction crews, with major works. The South Civil contract is anticipated to be completed in 2030.

The project will strengthen Ontario’s economy by supporting an estimated 1,500 jobs at the peak of construction.

What is the project?

A six-kilometer tunnel and associated tunnelling works from Exhibition to Don Yard portal (west of the Don River)

Stations: