ontariotransitgroup

Batching Plant Operator

Apply Now

At a Glance

Location
Toronto, Ontario, Canada
Employment
Full-time
Experience
2–3 years
Posted
2026-02-25T14:22:33.934Z

Key Requirements

Certifications

  • SAFe

Domain Knowledge

  • Construction

Benefits & Perks

Health Insurance

Insurance Extended medical insurance (Optional) RRSP matching Discretionary

Requirements

2–3 years of experience as a Batching Plant Operator, preferably within tunneling or heavy civil construction environments.

Physically capable of working rotating shifts and performing duties in a demanding industrial setting.

Strong verbal and written communication skills.

Proven commitment to maintaining a safe, compliant, and productive work environment.

Compensation & Benefits

What We Offer

Competitive Salary

Comprehensive Benefits Package:

Disability Insurance

Dental Insurance

Extended medical insurance

Responsibilities

The Batching Plant Operator is responsible for operating the surface batching plant, preparing grout mixtures, and pumping grout from the surface to two Tunnel Boring Machines (TBMs). This position requires technical expertise in operating industrial equipment (including concrete mixers and concrete pumps), strong attention to detail, situational awareness, and the ability to work safely in pressurized environments. The Operator works closely with both TBM crews to support efficient and safe tunnel advancement.

Key Responsibilities:

Coordinate with the Shift Manager regarding material inventory levels and stock requirements.

Manage the unloading of materials and ensure delivery tickets are accurately logged in the system and communicated to the Shift Manager and/or Store Manager.

Operate the mixer to prepare accurate grout batches according to project specifications.

Operate the grout pump to deliver consistent and reliable grout supply to both TBMs.

About the Company

Ferrovial Construction Canada Inc. and VINCI Construction Grands Projets are undertaking the design, build, and finance the Ontario Line Southern Civil, Stations, and Tunnel (South Civil) package

As Ontario Transit Group, we are now mobilizing our design and construction crews, with major works. The South Civil contract is anticipated to be completed in 2030.

The project will strengthen Ontario’s economy by supporting an estimated 1,500 jobs at the peak of construction.

What is the Project?

A six-kilometer tunnel and associated tunnelling works from Exhibition to Don Yard portal (west of the Don River).

Stations: