OntarioTransitGroup
Control Room Operator (TBM & Tunnel Operations)
At a Glance
- Location
- Toronto, Ontario, Canada
- Employment
- Full-time
- Posted
- 2026-07-02T18:42:43.982Z
Key Requirements
Certifications
- SAFe
Domain Knowledge
- Construction
- Mining
Benefits & Perks
Insurance Extended medical insurance (Optional) RRSP matching Discretionary
Requirements
Strong attention to detail and ability to monitor multiple systems simultaneously.
Compensation & Benefits
What We Offer
Competitive Salary
Comprehensive Benefits Package:
Disability Insurance
Dental Insurance
Extended medical insurance
Responsibilities
The Control Room Operator reports to the Shift Manager and plays a critical role in monitoring tunnel boring machine (TBM) operations, tunnel systems, and emergency tracking systems.
Continuously monitor operating parameters for two (2) Tunnel Boring Machines (TBMs) through the control room systems.
Monitor tunnel infrastructure systems for two (2) tunnels, including:
Ventilation systems and airflow
Emergency box alarms and notifications
Monitor emergency tracking systems, including the location of personnel and assets within the tunnels and TBM work areas.
About the Company
Ferrovial Construction Canada Inc. and VINCI Construction Grands Projets are undertaking the design, build, and finance the Ontario Line Southern Civil, Stations, and Tunnel (South Civil) package.
As Ontario Transit Group, we are now mobilizing our design and construction crews, with major works. The South Civil contract is anticipated to be completed in 2030.
The project will strengthen Ontario’s economy by supporting an estimated 1,500 jobs at the peak of construction.
What is the project?
A six-kilometer tunnel and associated tunnelling works from Exhibition to Don Yard portal (west of the Don River).
Stations: