gigaenergy

Materials Manager, Switchboards

Apply Now

At a Glance

Location
Long Beach, California, United States
Experience
7+ years
Posted
2026-07-20T17:32:35-04:00

Key Requirements

Required Skills

ERP

Domain Knowledge

  • Engineering
  • Manufacturing
  • Regulatory
  • Supply Chain

Benefits & Perks

Time Off

employer match Unlimited PTO Parental leave Healthcare and

Health Insurance

health, dental, and vision insurance Equity (options) in a rapidly growing s

Requirements

7+ years in materials management, production planning, or supply chain, ideally in switchboard, switchgear, electrical equipment, or related industrial manufacturing

Hands-on experience with BOM management, MRP/ERP systems, and master scheduling

Experience managing long lead-time materials — sheet metal enclosures, custom busbars, specialty electrical components, circuit breakers — in a switchboard or similar electrical equipment environment

Working knowledge of tariff classification and trade compliance (Section 301/232, USMCA, HTS)

Experience coordinating materials across multiple sites, including offshore contract manufacturers

Compensation & Benefits

Subsidized health, dental, and vision insurance

Equity (options) in a rapidly growing startup

401(k) with 4% employer match

Unlimited PTO

Parental leave

Healthcare and Dependent Care Flexible Spending Accounts (FSA) or Health Savings Account (HSA)

Responsibilities

Materials Manager for Switchboards

owns the flow of materials behind our switchboard production — sheet metal and enclosures, busbars, electrical components, and assembly hardware — from BOM accuracy and demand planning through to materials staged and ready to build.

You will manage materials planning and scheduling across our switchboard contract manufacturers, keep production supplied against manufacturing capacity, and manage the risk, lead time, and tariff exposure of a global switchboard supply base.

This role is the connective tissue between Procurement, Production, Engineering, and our contract manufacturers.

Own BOM accuracy and structure for switchboard products — enclosures, busbars, electrical components, and assembly hardware — in the ERP/MRP system

Translate the production schedule into materials requirements (MRP); convert demand into supplier releases and purchase requisitions